masthead - mg olympic logomasthead - incidental imagery
   
 
   
 
   

Case Studies

All examples of Case Studies shown are designed & installed by M & G Olympic Products Ltd to comply with all current Building Regulations.

tank museum project imageCase Studies Nine

THE TANK MUSEUM, BOVINGTON

CONTRACTOR: NORWEST HOLST LTD

ARCHITECT: KENNEDY O’CALLAGHAN

Supply & fix of cladding to the observation tower at The Tank Museum, Bovington. The cladding consists of self-coloured perforated aluminium panels to the Observation Tower which is to be used to control live events and battle re-enactments in the new tank arena. The Tower itself stands 25m high with the cladding covering an area 12.75m high x 9.5m circumference.

Supply and installation of galvanised polyester powder-coated balustrade & European Oak handrails to various internal stairs and landings. Handrails installed to staff areas and directors office as well as various corporate areas including curved stairs to waiting area to first floor bridge, café & museum landing, balustrade to café terrace, curved & raking handrails to museum ramps, marching step viewing bank and also back of house external escape stairs.

tank museum image

tank museum image

tank museum image

tank museum image

return to Case Studies menu